Wednesday, April 22, 2020

What Work is Taking Place?

  • Mining excavation works continue at the secondary entrance of Avenue Station, with crews operating between Eastbourne Avenue and Lascelles Boulevard. As part of these works, crews are required to break away the temporary inner walls of the cavern, to finalize the station structure.

 

  • Inner wall demolition will resume as early as Wednesday, April 22, 2020 and will occur 24 hours a day for approximately one (1) week. Periodic chipping and removal of concrete can be expected, while this work takes place. 

 

  • During these works, nearby properties may experience noise and/or vibration. Crews will endeavor to complete these works during the day, however due to the sequence nature of the work, occasional overnight work may be required. If you experience disruption from mining activities, please call our 24/7 phone line at 416-782-8118. 

 

Hours of Work

  • As early as Wednesday, April 22, 2020 for approximately one (1) week. 
  • Work will take place on a 24-hour basis. 
  • Work may be delayed or rescheduled due to inclement weather or unforeseen circumstances. 

 

Mining Progress

What to Expect

  •  Noise and/or vibration from chipping activities and concrete removal. 
  • Occasional overnight work may be required.
  • 24-hour mining operations, including excavation and drilling, between Eastbourne Avenue and Lascelles Boulevard. 

 

Traffic & Pedestrian Details

  • All pedestrian and traffic routes will remain the same.

Travelling Smart during Construction


Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10 a.m. and 3 p.m.
 

Stay Informed


Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

 

Disponible en français.

Thank you for your continued patience as we work to build this important project.

Please support your local businesses during construction.


Powered by Wild Apricot Membership Software