A tower crane removal taking place on the above dates at 91 Broadway Ave. This will entail the full closure of Broadway Ave from Redpath Ave to Yonge St.
Details:
· Mobile crane will be 950 tons with a 394' of boom
· This will entail a full closure of Broadway Ave from Redpath Ave to Yonge St.
· August 27th starting at 6pm to Monday August 30th 12pm
· Access to condos will be maintained
· Access and egress will be from Yonge St and Broadway.
· Broadway will become a temporary two way operation for closure.
· 4 Police Officers, 1 Sergeant overseeing traffic flow and safety during closure
· 10 traffic control persons to provide direction and assistance along Broadway Ave during closure