May 04, 2020 3:50 PM | David McMahon (Administrator)

Upcoming Hydro Utility Installation Work at Berwick Avenue

What Work is Taking Place?

Beginning in early May 2020, crews will perform hydro utility installation work in the existing work zone on Berwick Avenue and in the Berwick-Hillsdale laneway.  A hydro chamber will be constructed and the north half of the laneway will be trenched for cable installation.  Once complete, the area will be restored.

 

 

Hours of Work

• Early May 2020 for approximately two (2) weeks

• Work will take place between 7:00 a.m. – 7:00 p.m.

• This work may be rescheduled due to inclement weather or unforeseen circumstances

 

What to Expect

• Noise from construction activity, including trucks and heavy equipment can be expected

• Trenching in the north half of the laneway can be expected

• All property access is expected to be maintained, though vehicles and pedestrians may have to enter the laneway from either side depending on the location of the work

• Expect delays when travelling in the vicinity of Berwick Ave during this work

 

Traffic and Pedestrian Impacts

• The existing work zone will remain in place

• No through access in the Berwick-Hillsdale laneway will be permitted during each shift

• At the end of each shift, the trenches will be plated and through access will be restored

• Access to Canada Square parking lot, 2180 Yonge St loading dock and the TTC Bus Bay will be maintained

• Vehicles and pedestrians may experience delays when travelling through the area

 

Travelling Smart during Construction

Travel delays are expected with the Crosstown construction. Please allow extra time for your journey. Traffic will be extra heavy at peak periods during the Crosstown construction. When possible, please travel during the off-peak period between 10:00 a.m. and 3:00 p.m.

 

Stay Informed

Sign up for e-mail updates at www.thecrosstown.ca/sign-up or download the Crosstown traffic app to get real-time traffic and transit information for the Eglinton corridor.

 

Thank you for your continued patience as we work to build this important project.

Please support your local businesses during construction.